Tuesday, May 5, 2020
A Case Study of Kitchen Refurbishment by Carillion FM Free Sample
  Question:  Discuss about the Case Study of Kitchen Refurbishment by Carllion FM.      Answer:    Assumptions for the project  This project is focused on the refurbishment of kitchen of a property to a modern standard and redecorating the interiors. Carillion FM has undertaken this project after the site visit and assessment of the existing structure, finishing and services. However, some assumptions have been made to ensure success of the project as listed below:  The materials that will be procured for required installation and repairing must be of high quality.  The design of the project must be compatible in context to architectural point of view.    The remodeling of kitchen must be done such that it meets the construction, codes and standards for fire and safety.  There must be access to drainage so that servicing and installations of updated systems can be carried out efficiently.  The completion of the project will ensure that the property can be used for accommodation of family.  Programme for the project in Microsoft project  Timeline for the project          WBS      Task Name      Duration      Start      Finish      Predecessors      Resource Names          0      Refurbishment of kitchen to a modern standard      107 days      Mon 1/23/17      Tue 6/20/17              1      Project Startup      1 day      Tue 4/4/17      Tue 4/4/17        Project Manager          2      Demolishing and Fabrication works      55 days      Wed 4/5/17      Tue 6/20/17              2.1      Removal of lathe, plaster wall and ceiling      7 days      Wed 4/5/17      Thu 4/13/17      1      General Trades for demolition and cleaning          2.2      Plastering and lining up ceiling with plasterboard and skimmed      5 days      Fri 4/14/17      Thu 4/20/17      3      Plasterer          2.3      New partition with 75mm timber stud wall having both sides plasterboard      4 days      Fri 4/21/17      Wed 4/26/17      4      Plasterer          2.4      Trimming of study ceiling      3 days      Thu 4/27/17      Mon 5/1/17      5      General Trades for demolition and cleaning          2.5      Installation of new study door      2 days      Tue 5/2/17      Wed 5/3/17      6      Decorator          2.6      Floor Layout      14 days      Thu 5/4/17      Tue 5/23/17              2.6.1      Floor covering with Karndean vinyl tiles      3 days      Thu 5/4/17      Mon 5/8/17      7      Floor Layer          2.6.2      Two coats of protective varnish on tiles      2 days      Thu 5/18/17      Fri 5/19/17      9FS+7 days      Floor Layer          2.6.3      Laying of 12mm plywood over the whole kitchen area      2 days      Mon 5/22/17      Tue 5/23/17      10      Floor Layer          2.7      Fitting of new skirting boards in kitchen      3 days      Wed 5/24/17      Fri 5/26/17      11      Floor Layer          2.8      Trimming and refixing of skirting boards in study      1 day      Mon 5/29/17      Mon 5/29/17      12      Floor Layer          2.9      2 coats emulsion paint on walls and ceiling of both kitchen and study      2 days      Tue 5/30/17      Wed 5/31/17      13      Floor Layer, Plasterer          2.10      Gloss painting in skirting boards, door frames, doors and window boards      2 days      Thu 6/1/17      Fri 6/2/17      14      Plasterer          2.11      Fitting of ceramic tiles on back wall of sink and cooker      2 days      Mon 6/5/17      Tue 6/6/17      15      Floor Layer          2.12      Application of new ceiling coving to the kitchen and study      3 days      Wed 6/7/17      Fri 6/9/17      16      Plasterer          2.13      Fittings of lighting in kitchen and study      1 day      Mon 6/12/17      Mon 6/12/17      17      Electrician          2.14      Redecorating interior of the house      3 days      Tue 6/13/17      Thu 6/15/17      18      Decorator          2.15      2 coats emulsion to walls and ceilings, gloss paint doors and other woodwork      2 days      Fri 6/16/17      Mon 6/19/17      19      Decorator          2.16      Final cleaning      1 day      Tue 6/20/17      Tue 6/20/17      20      General Trades for demolition and cleaning          3      Installation works      55 days      Mon 1/23/17      Fri 4/7/17              3.1      Delivery of components to the site      1 day      Fri 3/31/17      Sat 4/1/17      27SF-3 edays      Carpenter, Project Manager          3.2      Marking up the locations of various points      1 day      Mon 3/13/17      Tue 3/14/17      27SF-3 ewks      Fitter          3.3      Confirmation on installation of points in correct locations      1 day      Mon 3/27/17      Tue 3/28/17      27SF-1 ewk      Company Fitter          3.4      Sign-off by kitchen company before installation date      1 day      Mon 1/23/17      Tue 1/24/17      27SF-10 ewks      Company Fitter          3.5      Begin installation      4 days      Tue 4/4/17      Fri 4/7/17        Company Fitter, Fitter, Gas Engineer, Plumber          4      Notification to tenants      1 day      Mon 4/10/17      Mon 4/10/17      27      Project Manager          5      Moving in to the accommodation      1 day      Tue 4/11/17      Tue 4/11/17      28      Project Manager          6      Project Closeout      0 days      Tue 4/11/17      Tue 4/11/17      29      Project Manager          Cost for resources          Resource Name      Type      Initials      Max. Units      Std. Rate      Accrue At      Base Calendar          Decorator      Work      DC      200%      $45.00/hr      Prorated      Standard          Electrician      Work      EC      200%      $35.00/hr      Prorated      Standard          Plumber      Work      PB      200%      $30.00/hr      Prorated      Standard          Gas Engineer      Work      GE      100%      $40.00/hr      Prorated      Standard          Carpenter      Work      CP      100%      $30.00/hr      Prorated      Standard          Plasterer      Work      PL      100%      $35.00/hr      Prorated      Standard          General Trades for demolition and cleaning      Work      GTC      200%      $25.00/hr      Prorated      Standard          Floor Layer      Work      FL      100%      $30.00/hr      Prorated      Standard              Bibliography  Burke, R., 2013. Project management: planning and control techniques.New Jersey, USA.  Heagney, J., 2016.Fundamentals of project management. AMACOM Div American Mgmt Assn.  Hill, G.M., 2013.The complete project management office handbook. CRC Press.  Kerzner, H., 2013.Project management: a systems approach to planning, scheduling, and controlling. John Wiley  Sons.  Lock, M.D., 2014.The essentials of project management. Ashgate Publishing, Ltd..  Martinelli, R.J. and Milosevic, D.Z., 2016.Project management toolbox: tools and techniques for the practicing project manager. John Wiley  Sons.  Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International Journal of Project Management,32(2), pp.202-217.  Newton, R., 2016.Project management step by step: how to plan and manage a highly successful project. Pearson UK.  Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance.International Journal of Project Management,32(8), pp.1382-1394.  Turner, R., 2016.Gower handbook of project management. Routledge.    
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.